Constructed Futures, An AI Edge Podcast

Franco Giaquinto: The Future of Construction Scheduling with Ipsum

Episode Summary

Scheduling is at the core of construction projects, the team at Ipsum have taken a fresh look at schedule planning and created a lightweight, easy to use product that promises to provide top notch features for mid-market and larger contractors. CEO Franco Giaquinto outlines their progress and plans for the future.

Episode Notes

Follow Franco here:

Check out Ipsum here: https://www.ipsumapp.co/